Yeah, they finished this front part of the bricks. Now they have to take down the scaffolding so the sheet rock can load up through that opening (we stapled plastic over the opening because rain kept pouring in). That should be loaded in by the end of the week and we are really hoping drywall is finished by the end of next week!


Back of house. It's been raining EVERY day this week. We hope they are finished by Saturday.... we hope.
Spray in insulation in the kitchen/living room

one front door, study, and stairs going upstairs

Hallway. Powder room is the door on the right and then the other door is to the master bedroom. The brown is "green" recycled batting.

Study and stairs going up

Looking out the front doors

Looking up from the hallway upstairs into the attic. Foam insulation in the attic! What a difference it makes already, even way up high.

Spray in insulation in the walls and then batting where the soffets are outside. They will come back and spray over the batting.

Then, it will look like this. View of the upstairs rec room, sprayed in walls and attic